Grand Prairie Subdivision

[Winlock, WA] Windsor Engineers provided planning and design services associated with Phases IV and V of the Grand Prairie Estates 202 unit subdivision in Winlock, Washington. The design work included grading and drainage design, stormwater catch basins, conveyance piping, and connecting into existing stormwater treatment facilities. The project also included coordination with the City of Winlock, their contract engineer, the Washington Department of Transportation and design of streets, water, street lighting, traffic analysis and sanitary sewer.

Project Numbers

Winlock, Washington

Infrastructure

Project Gallery

© 2020 Windsor Engineers     Duluth: 218.206.8484     Vancouver: 360.610.4931        info@windsorengineers.com

Duluth, Minnesota Office:  4802 Oneota Street, Suite 2, Duluth, MN 55807

Twin Cities, Minnesota Office:  12800 Industrial Park Boulevard, Plymouth, MN 55441

Vancouver, Washington Office:  12009 NE 99th St Suite 1460, Vancouver, WA 98682