Washougal Northside Lift Station

[City of Washougal, WA] In need of more capacity to serve a new basin in a growing area of Washougal, the city needed new pumping capacity on the north side of the City. The pump station will be owned and operated by the City. Northside LLC contracted with Windsor to work with the City and coordinate with the developer’s civil engineer to design the station. Keeping in mind the present and future flows to the station it was designed to accommodate low flows initially with large flows eventually. With the future flows in mind odor control facilities were included in the design, along with a natural gas generator.

Project Numbers

City of Washougal, Washington

Infrastructure

Project Gallery

1/0