top of page
Windsor Engineer_Cleveland Timber Building.jpeg
Windsor Project Page graphic2.jpg

MnDOT LAVATORIES

Windsor was contracted through an architect to work with MNDOT on lavatory renovations and additions to multiple MnDOT District Headquarters. The project scope included 4 sites with a total of 9 bathrooms and required MEP renovation drawings and specifications to meet current codes. Windsor received as-builts from recent renovations where applicable and used the company’s 360° camera to capture existing conditions at each site.

LOCATION

Minnesota

bottom of page