Windsor Engineer_Cleveland Timber Building.jpeg
Windsor Project Page graphic2.jpg

SKAMANIA ELEMENTARY SCHOOL

Windsor provided full mechanical and electrical design & construction
services for a 30,000 SF historic primary school This project is part of a
modernization effort to update the facility’s technology and systems to
current codes. Windsor meticulously investigated the facility to determine
existing conditions and the scope of work required. After completing a study
and analysis of the building mechanical, electrical, and low voltage systems
condition and performance along with analysis of relevant state and local
building codes, and other associated legal requirements; construction-ready
plans were produced and priced. The project scope included complete replacement of the existing aging HVAC systems, installation of a completely new electrical service to support
the upgrades, and a complete replacement of the lighting and controls with high-efficiency LED. Indoor air quality and comfort was maximized while controlling project cost and energy consumption.

LOCATION

Stevenson, Washington