FIRE STATION 34 GENERATOR

Fire District 3 needed to install a standby backup generator at their existing fire station 34 located at Hockinson, WA. The Fire District required the generator be sized to handle the entire load of the station building. Windsor provided engineering services to size and specify a generator and design the system revisions necessary to accommodate the new generator. Services specifically included a site visit to verify existing conditions, load calculations, bid plans/specifications, and bid/construction support.

LOCATION

Hockeinson, Washington