top of page

GREEN MOUNTAIN SCHOOL MECHANICAL UPGRADES

GREEN MOUNTAIN SCHOOL MECHANICAL UPGRADES

As part of an initiative to modernize technology and meet current mechanical, electrical, and plumbing code requirements, Windsor was hired to evaluate the situation and engineer solutions. After completing a thorough site investigation, study and analysis of the building mechanical, electrical, plumbing, and low voltage systems condition and performance along with analysis of relevant state and local building codes, and other associated legal requirements; construction-ready plans were produced and priced. Windsor scope included: Mechanical, Electrical, and Plumbing design services for HVAC system replacement, Electrical System and Lighting Replacements/Upgrades, and septic system expansion.

bottom of page