top of page
LYLE SCHOOL DISTRICT HVAC AND ROOF REPLACEMENT
Lyle Secondary School existing heating, ventilation, and air conditioning (HVAC) and HVAC controls system were at the end of their serviceable life and in need of replacement. Windsor Engineers conducted the HVAC system assessment of the 39,800 square-foot facility to identify the deficiencies and propose solutions for necessary upgrades. Windsor performed detailed design, bidding, and construction administration for the HVAC improvements identified, as well as a partial roofing replacement.
bottom of page