top of page
WASHOUGAL NORTHSIDE SEWER LIFT STATION
In need of more capacity to serve a new basin in a growing area of Washougal, the City required new pumping capacity on its north side. The pump station will be owned and operated by Washougal. Northside LLC contracted with Windsor to work with the City and coordinate with the developer’s civil engineer to design the station. Keeping in mind the present and future flows to the station, it was designed to accommodate low flows initially with large flows eventually. With the future flows in mind, odor control facilities were included in the design, along with a natural gas generator.
bottom of page