top of page
Windsor Background.png

PROJECTS

Windsor Engineers provides a wide range of MEP and Civil Infrastructure services that offer innovative and sustainable solutions to our clients' unique challenges. Our commitment to collaboration allows us to bring together a team of experts who are dedicated to delivering quality work and exceptional results. Explore our projects and learn more about how Windsor Engineers can help you achieve your project goals.

Filter by project type:
The design for the Stack Data Hall utilized fan walls and a drop ceiling with hot and cold aisles. The design included cooling and ventilation systems for two levels of electrical rooms. The existing chilled water system was expanded with the addition of two new cooling towers and two chillers.

STACK DATA HALL

Windsor Engineers provided engineering and land use services to alter a short plat and assist a property owner in obtaining Road Modification, Grading Plan, and Plat Alteration approvals.  Windsor worked closely with Clark County Code Compliance, Engineering, and Planning Departments to complete this project.  The project was constructed by Lindberg Pipe & Grade.

379th STREET GRADING, ROAD MODIFICATION, AND PLAT ALTERATION

Bids for a pump station at La Center's new middle school came in higher than hoped. The project’s civil contractor, Tapani Inc, came up with a money-saving design-build alternative to the packaged system that was proposed to serve the new La Center Middle School and surrounding City sewer basin. They turned to Windsor for a pump station design that was fully customized and met the owner/operator (City of La Center) needs while providing significant savings to the school district.

LA CENTER MIDDLE SCHOOL PUMP STATION

Windsor Engineers provide preapplication, preliminary plat services, and civil engineering services for a new apartment building in Woodland, WA.  Windsor was the civil engineer. The apartment building was designed by Jackola Architecture (architectural / structural) and Windsor Engineers (mechanical, electrical, plumbing). The project included extensive coordination with the City and Clark County Fire & Rescue as it relates to access, water, sewer, stormwater, etc.

WOODLAND BOZARTH MULTI-FAMILY

Windsor Engineers is providing pipeline design and bid support services
for the NE 83rd Street Watermain Replacement project which
replaces approximately 1,135 feet of Clark Public Utilities’ watermain.
An existing 4-inch steel main with approximately 29 services and
a single fire hydrant are being abandoned and replaced with an
upsized 6-inch C900 PVC waterline to support Clark Public Utilities’
growing water system. Design included Clark County and Clark
Public Utilities design standards and 2022 WSDOT Standard
Specifications.

CLARK PUBLIC UTILITIES, 83RD STREET

Windsor Engineers was contracted by the City of Hood River to provide comprehensive wastewater treatment plant administrative services.  Services include assessments, consultant oversight, RFP development, bid package development, industrial pretreatment oversight, and contract operations oversight.

HOOD RIVER WASTEWATER ADMIN. SERVICES

The project consists of renovation of an existing 10,000 SF two-story plus basement building. The building is to be used as a shelter for victims of abuse. The renovation will include offices, commercial kitchen/dining, meeting rooms, and sleeping rooms with associated amenities. The project is in partnership with a domestic violence program that empowers survivors by providing free information, resources, and support to increase safety and foster healing while maintaining confidentiality.

DOMESTIC VIOLENCE SHELTER

Windsor Engineers designed a new water distribution system to replace aging water lines. The project served several locations in Oswald West State Park, including the Short Sands Beach restrooms. The project was designed by Windsor following a challenging field assignment to develop as-builts of the current system.

OSWALD WEST SHORT SANDS BEACH WATER SYSTEM

Windsor provided schematic MEP design on this collaboration with Clark Barnes Architects. This 163 unit multi-family project located in Seattle's Queen Anne neighborhood features a rooftop terrace among other modern amenities. A key design feature of the project required close coordination of a stormwater bio-retention system that directs rainwater into large planters, located at street level. After leaving the planters the water is directed into the city stormwater system.

2222 15TH APARTMENTS

Windsor Engineers provide Civil and Electrical Engineering services for a short plat at the historic Dick’s Tires location in Battle Ground.  The project included stormwater analysis and design, sidewalk design, traffic access design, landscape design, and coordination with the surveyor and land use planner on preliminary and final plat completion. Project construction was completed by Schneider & Sons

DICK'S TIRES

Windsor Engineers collaborated with ADK Electric on the Tree Hill Learning Center project, a 5,900 square foot single-story, wood-framed childcare facility in Vancouver, WA. Windsor scope included comprehensive electrical system design including power distribution, branch power, lighting, emergency egress lighting, and control systems, all designed to meet code requirements and owner specifications.

VANCOUVER TREE HILL LEARNING

The Mercy Hospital remodeled and upgraded the Pharmacy Suite to comply with United States Pharmacopeia (USP) 800 Standards. The project was designed to minimize downtime of chemotherapy compounding and included temporary ventilation and exhaust to maintain previous design requirements while a new pharmacy suite was constructed. The project was designed to maintain tight pressure, temperature, and humidity tolerances, included full 3D Scanning, stitching, and incorporation into our BIM model, new ante Room and Hazardous Hood, and connection to existing Variable Air Volume (VAV) air handler medium pressure ductwork.

MERCY HOSPITAL PHARMACY

bottom of page