top of page
Windsor Engineer_Cleveland Timber Building.jpeg
Windsor Project Page graphic2.jpg

CANNON BEACH WATER RESILIENCY

Windsor Engineers is currently developing a prioritized Capital Improvement Plan (CIP) that is intended to develop a strategy for how to provide water to citizens following a subduction zone earthquake. The project balances recommendations from their Water Master Plan and from a follow-up seismic study that was performed. Additionally, Windsor Engineers is developing recommendations for what to do with the Main Reservoir. It has significant seismic vulnerabilities. Rehabbing, replacing in place, and replacing at a new site are being considered.

LOCATION

Cannon Beach, Oregon

bottom of page