top of page
Windsor Engineer_Cleveland Timber Building.jpeg
Windsor Project Page graphic2.jpg

WASHOUGAL RESERVOIR & BOOSTER PUMP STATION

A new water supply reservoir and pump station was needed to support a new development in Washougal. The project enables development of an area with great views, large lots, and excellent schools. After a thorough study of the situation and weighing of alternatives with the client, Windsor engineered a reservoir and booster pump station that met the budget and water demand. Going above and beyond work normally provided by a civil engineer, Windsor provided a 3-D model that helped all stakeholders envision the project. This helped enormously with coordination and prevented cost overruns associated with unclear plans. On behalf of Northside LLC and performed with Tapani Inc, Windsor Engineers led the Design-Build team for construction of a new standpipe reservoir and booster pump station. Project consisted of the 76' tall, 44' diameter, 827k gallon welded steel reservoir to provide storage capacity for Zone 3; a 1,685 gpm booster pump station for servicing Zone 5; erosion control, earthwork, pump station building, civil/mechanical piping, electrical, emergency generator, instrumentation/controls, fencing, and landscaping. The system will be City owned and operated.

LOCATION

City of Washougal, Washington

bottom of page